<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: Westermost Rough Wind Farm</title>
    <link>https://qualla.com/westermost-rough-wind-farm</link>
    <description><![CDATA[The world's first commercial wind farm to use Siemens' gearless 6 MW turbines stands eight kilometres off a Yorkshire coast already crowded with two centuries of energy industry.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:34 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[The world's first commercial wind farm to use Siemens' gearless 6 MW turbines stands eight kilometres off a Yorkshire coast already crowded with two centuries of energy industry.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: Westermost Rough Wind Farm</title>
      <link>https://qualla.com/westermost-rough-wind-farm</link>
    </image>
    <item>
      <title>Westermost Rough Wind Farm: Introduction</title>
      <link>https://qualla.com/westermost-rough-wind-farm/</link>
      <description><![CDATA[Eight kilometres off Withernsea, thirty-five squarish kilometres of North Sea are pinned down by tall white machines that turn the wind into electricity. Westermost Rough Wind Farm became operational in May 2015 and was the first commercial deployment anywhere of Siemens' gearless 6 MW direct-drive turbines - a quiet engineering milestone in a part of the sea already crowded with gas platforms, U-boat wrecks and the lights of east-coast fishing ports. The acronym of its original Danish developer, DONG Energy, would later embarrass the company so much it changed its name.]]></description>
      <content:encoded><![CDATA[<p>Eight kilometres off Withernsea, thirty-five squarish kilometres of North Sea are pinned down by tall white machines that turn the wind into electricity. Westermost Rough Wind Farm became operational in May 2015 and was the first commercial deployment anywhere of Siemens' gearless 6 MW direct-drive turbines - a quiet engineering milestone in a part of the sea already crowded with gas platforms, U-boat wrecks and the lights of east-coast fishing ports. The acronym of its original Danish developer, DONG Energy, would later embarrass the company so much it changed its name.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/westermost-rough-wind-farm/">Westermost Rough Wind Farm on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 31 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Westermost Rough Wind Farm: Total&apos;s Withdrawal, DONG&apos;s Bet</title>
      <link>https://qualla.com/westermost-rough-wind-farm/</link>
      <description><![CDATA[Wind farms in UK waters come with histories before they come with turbines. The Westermost Rough site was originally awarded in 2003 to the French oil major Total during the Round 2 tendering process - the second wave of UK offshore wind leases issued by the Crown Estate. Total s...]]></description>
      <content:encoded><![CDATA[<p>Wind farms in UK waters come with histories before they come with turbines. The Westermost Rough site was originally awarded in 2003 to the French oil major Total during the Round 2 tendering process - the second wave of UK offshore wind leases issued by the Crown Estate. Total s...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/westermost-rough-wind-farm/">Westermost Rough Wind Farm on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 31 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-totals-withdrawal-dongs-bet.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-totals-withdrawal-dongs-bet.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Westermost Rough Wind Farm: The First Gearless Sixes</title>
      <link>https://qualla.com/westermost-rough-wind-farm/</link>
      <description><![CDATA[Westermost Rough's significance to wind engineering is small but real: it was the first commercial wind farm anywhere in the world to use Siemens' gearless 6 MW turbines. A conventional wind turbine has a gearbox between the slow-turning rotor and the fast-spinning generator. The...]]></description>
      <content:encoded><![CDATA[<p>Westermost Rough's significance to wind engineering is small but real: it was the first commercial wind farm anywhere in the world to use Siemens' gearless 6 MW turbines. A conventional wind turbine has a gearbox between the slow-turning rotor and the fast-spinning generator. The...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/westermost-rough-wind-farm/">Westermost Rough Wind Farm on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 31 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-the-first-gearless-sixes.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-the-first-gearless-sixes.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Westermost Rough Wind Farm: From DONG to Orsted</title>
      <link>https://qualla.com/westermost-rough-wind-farm/</link>
      <description><![CDATA[In 2017, DONG Energy renamed itself Orsted - after the Danish physicist Hans Christian Orsted, who in 1820 discovered the connection between electricity and magnetism that makes every generator work. The reason for the renaming was more prosaic: DONG stood for Danish Oil & Natura...]]></description>
      <content:encoded><![CDATA[<p>In 2017, DONG Energy renamed itself Orsted - after the Danish physicist Hans Christian Orsted, who in 1820 discovered the connection between electricity and magnetism that makes every generator work. The reason for the renaming was more prosaic: DONG stood for Danish Oil & Natura...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/westermost-rough-wind-farm/">Westermost Rough Wind Farm on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 31 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-from-dong-to-orsted.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-from-dong-to-orsted.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Westermost Rough Wind Farm: What the Tide Does With Them</title>
      <link>https://qualla.com/westermost-rough-wind-farm/</link>
      <description><![CDATA[Thirty-five turbines in a North Sea swell are an oddly delicate-looking thing. From the beach at Withernsea on a clear day you can see them as faint white verticals on the horizon, slowly turning. Closer in, they are huge: the rotor of a Siemens 6 MW spans 154 metres, more than t...]]></description>
      <content:encoded><![CDATA[<p>Thirty-five turbines in a North Sea swell are an oddly delicate-looking thing. From the beach at Withernsea on a clear day you can see them as faint white verticals on the horizon, slowly turning. Closer in, they are huge: the rotor of a Siemens 6 MW spans 154 metres, more than t...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/westermost-rough-wind-farm/">Westermost Rough Wind Farm on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 31 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-what-the-tide-does-with-them.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/8/4/westermost-rough-wind-farm-wp/u184-westermost-rough-wind-farm-what-the-tide-does-with-them.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
