<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: Tapajos Hydroelectric Complex</title>
    <link>https://qualla.com/tapajos-hydroelectric-complex</link>
    <description><![CDATA[A proposed chain of five Amazon dams that promised ten gigawatts of power and a soy-barge highway, defeated by Munduruku resistance and a constitutional prohibition on flooding indigenous land.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:08 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[A proposed chain of five Amazon dams that promised ten gigawatts of power and a soy-barge highway, defeated by Munduruku resistance and a constitutional prohibition on flooding indigenous land.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/hero-small.webp"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/hero-small.webp</url>
      <title>Qualla: Tapajos Hydroelectric Complex</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex</link>
    </image>
    <item>
      <title>Tapajos Hydroelectric Complex: Introduction</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. At its peak, the plan called for five dams to turn more than 2,000 square kilometers of Amazon forest into reservoirs. The combined installed capacity would have been 10,682 megawatts, roughly equivalent to burning thirty million barrels of oil a year. The dams would have contained enormous locks to convert the Tapajos and Jamanxim rivers into a soy-barge highway from Mato Grosso to the Atlantic. The Munduruku who live on the Tapajos understood exactly what this meant. They spent a decade stopping it.]]></description>
      <content:encoded><![CDATA[<p>Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. At its peak, the plan called for five dams to turn more than 2,000 square kilometers of Amazon forest into reservoirs. The combined installed capacity would have been 10,682 megawatts, roughly equivalent to burning thirty million barrels of oil a year. The dams would have contained enormous locks to convert the Tapajos and Jamanxim rivers into a soy-barge highway from Mato Grosso to the Atlantic. The Munduruku who live on the Tapajos understood exactly what this meant. They spent a decade stopping it.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Thâmily Vivian Massari | CC BY-SA 4.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-intro-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: The Engineering Vision</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. The centerpiece was Sao Luiz do Tapajos, a 7,608-meter-long dam that would have stood 53 meters above the Tapajos with a reservoir of 729 square kilometers. Thirty-eight Kaplan turbines would have generated a guaranteed 4,012 megawatts. Upstream, the Jatoba Dam would have added 2...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. The centerpiece was Sao Luiz do Tapajos, a 7,608-meter-long dam that would have stood 53 meters above the Tapajos with a reservoir of 729 square kilometers. Thirty-eight Kaplan turbines would have generated a guaranteed 4,012 megawatts. Upstream, the Jatoba Dam would have added 2...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Greenpeace  Brasil from Brasil | CC BY 2.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-engineering-vision.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-engineering-vision.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-engineering-vision-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: The Platform That Never Worked</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. Planners knew the political problem from the start. Traditional hydroelectric construction builds access roads to remote dam sites, and those roads attract loggers, ranchers, and squatters who do far more damage to the forest than the dam itself. The proposed solution came out of...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. Planners knew the political problem from the start. Traditional hydroelectric construction builds access roads to remote dam sites, and those roads attract loggers, ranchers, and squatters who do far more damage to the forest than the dam itself. The proposed solution came out of...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Greenpeace  Brasil from Brasil | CC BY 2.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-platform-that-never-worked.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-platform-that-never-worked.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-platform-that-never-worked-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: The Thirteen Thousand</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. Around thirteen thousand Munduruku live along the Tapajos and its tributaries. The dams, if built, would have drowned parts of the Sawre Muybu, Munduruku, and Sai-Cinza indigenous territories. Government-funded studies recommended relocating people, a suggestion the Munduruku fie...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Greenpeace  Brasil from Brasil, CC BY 2.0. Around thirteen thousand Munduruku live along the Tapajos and its tributaries. The dams, if built, would have drowned parts of the Sawre Muybu, Munduruku, and Sai-Cinza indigenous territories. Government-funded studies recommended relocating people, a suggestion the Munduruku fie...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Greenpeace  Brasil from Brasil | CC BY 2.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-thirteen-thousand.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-thirteen-thousand.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-thirteen-thousand-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: Confrontation on the Tapajos</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Brazil_location_map.svg: NordNordWest
derivative work: Виктор В (talk), CC BY-SA 3.0. In November 2012, federal police shot and killed Adenilson Munduruku in the region. The following April, 24 researchers entered the area under military and police protection to conduct surveys for the dam. The Federal Public Ministry filed to have Operation Tapajos suspended, arg...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Brazil_location_map.svg: NordNordWest
derivative work: Виктор В (talk), CC BY-SA 3.0. In November 2012, federal police shot and killed Adenilson Munduruku in the region. The following April, 24 researchers entered the area under military and police protection to conduct surveys for the dam. The Federal Public Ministry filed to have Operation Tapajos suspended, arg...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Brazil_location_map.svg: NordNordWest
derivative work: Виктор В (talk) | CC BY-SA 3.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-confrontation-on-the-tapajos.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-confrontation-on-the-tapajos.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-confrontation-on-the-tapajos-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: The April That Ended It</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. On April 17, 2016, the Brazilian Chamber of Deputies voted to impeach President Dilma Rousseff. Two days later, on April 19, FUNAI published the identification study recognizing the Sawre Muybu Indigenous Territory. On the same day, IBAMA suspended environmental licensing for the...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. On April 17, 2016, the Brazilian Chamber of Deputies voted to impeach President Dilma Rousseff. Two days later, on April 19, FUNAI published the identification study recognizing the Sawre Muybu Indigenous Territory. On the same day, IBAMA suspended environmental licensing for the...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Thâmily Vivian Massari | CC BY-SA 4.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-april-that-ended-it.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-april-that-ended-it.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>6</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-the-april-that-ended-it-cover.jpg"/>
    </item>
    <item>
      <title>Tapajos Hydroelectric Complex: What the Numbers Showed</title>
      <link>https://qualla.com/tapajos-hydroelectric-complex/</link>
      <description><![CDATA[Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. Two independent studies had already undermined the economic case. A 2014 analysis concluded that electricity demand forecasts had been overstated and that improvements in energy efficiency and falling costs of solar and wind power were not reflected in the plan. Once transmission...]]></description>
      <content:encoded><![CDATA[<p>Photo credit Thâmily Vivian Massari, CC BY-SA 4.0. Two independent studies had already undermined the economic case. A 2014 analysis concluded that electricity demand forecasts had been overstated and that improvements in energy efficiency and falling costs of solar and wind power were not reflected in the plan. Once transmission...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/tapajos-hydroelectric-complex/">Tapajos Hydroelectric Complex on Qualla</a></p><p><em>Image: Thâmily Vivian Massari | CC BY-SA 4.0</em></p>]]></content:encoded>
      <pubDate>Thu, 16 Apr 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-what-the-numbers-showed.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-what-the-numbers-showed.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>7</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
      <itunes:image href="https://qualla.com/_m/6/x/p/v/tapajos-hydroelectric-complex-wp/6xpv-tapajos-hydroelectric-complex-what-the-numbers-showed-cover.jpg"/>
    </item>
  </channel>
</rss>
