<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: Soubre Hydroelectric Power Station</title>
    <link>https://qualla.com/soubre-hydroelectric-power-station</link>
    <description><![CDATA[Built by Sinohydro and commissioned in 2017, the Soubre dam harnesses a cascade of waterfalls on the Sassandra River to generate 275 megawatts -- ten percent of Ivory Coast's electricity.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:17 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[Built by Sinohydro and commissioned in 2017, the Soubre dam harnesses a cascade of waterfalls on the Sassandra River to generate 275 megawatts -- ten percent of Ivory Coast's electricity.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: Soubre Hydroelectric Power Station</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station</link>
    </image>
    <item>
      <title>Soubre Hydroelectric Power Station: Introduction</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station/</link>
      <description><![CDATA[The Sassandra River drops 19 meters over a 4.5-kilometer stretch near the city of Soubre in southwestern Ivory Coast -- not a single dramatic waterfall but a cascade, the river stepping down through a series of rocky shelves as it flows toward the Gulf of Guinea. For centuries, this cascade was a navigational obstacle, a place where canoes had to portage and the river's energy dissipated into spray and foam. In 2017, that energy found a new purpose. The Soubre Hydroelectric Power Station, built across the cascade at a cost of 500 million euros, began feeding 275 megawatts into Ivory Coast's electrical grid -- enough to supply roughly ten percent of the nation's generating capacity and the largest single hydroelectric facility the country had ever built.]]></description>
      <content:encoded><![CDATA[<p>The Sassandra River drops 19 meters over a 4.5-kilometer stretch near the city of Soubre in southwestern Ivory Coast -- not a single dramatic waterfall but a cascade, the river stepping down through a series of rocky shelves as it flows toward the Gulf of Guinea. For centuries, this cascade was a navigational obstacle, a place where canoes had to portage and the river's energy dissipated into spray and foam. In 2017, that energy found a new purpose. The Soubre Hydroelectric Power Station, built across the cascade at a cost of 500 million euros, began feeding 275 megawatts into Ivory Coast's electrical grid -- enough to supply roughly ten percent of the nation's generating capacity and the largest single hydroelectric facility the country had ever built.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/soubre-hydroelectric-power-station/">Soubre Hydroelectric Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Soubre Hydroelectric Power Station: Engineering a Cascade</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station/</link>
      <description><![CDATA[The technical challenge at Soubre was not building a conventional high dam across a narrow gorge -- the terrain did not offer one. Instead, the engineers had to harness a distributed drop: 19 meters of elevation change spread over 4.5 kilometers of river. The solution was a barra...]]></description>
      <content:encoded><![CDATA[<p>The technical challenge at Soubre was not building a conventional high dam across a narrow gorge -- the terrain did not offer one. Instead, the engineers had to harness a distributed drop: 19 meters of elevation change spread over 4.5 kilometers of river. The solution was a barra...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/soubre-hydroelectric-power-station/">Soubre Hydroelectric Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-engineering-a-cascade.mp3</guid>
      <enclosure url="https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-engineering-a-cascade.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Soubre Hydroelectric Power Station: The Price and the Partners</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station/</link>
      <description><![CDATA[Soubre was not built with Ivorian money alone. The Export-Import Bank of China provided 85 percent of the project's financing through a loan, with the Ivorian government contributing the remaining 15 percent as equity. The arrangement reflects a pattern visible across Africa and ...]]></description>
      <content:encoded><![CDATA[<p>Soubre was not built with Ivorian money alone. The Export-Import Bank of China provided 85 percent of the project's financing through a loan, with the Ivorian government contributing the remaining 15 percent as equity. The arrangement reflects a pattern visible across Africa and ...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/soubre-hydroelectric-power-station/">Soubre Hydroelectric Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-the-price-and-the-partners.mp3</guid>
      <enclosure url="https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-the-price-and-the-partners.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Soubre Hydroelectric Power Station: The River&apos;s Other Life</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station/</link>
      <description><![CDATA[The Sassandra is the second-longest river in Ivory Coast, flowing roughly 650 kilometers from the Guinea Highlands to the Atlantic coast. Before the dam, the cascade near Soubre was part of a natural rhythm that fish and riverside communities had adapted to over millennia. The ri...]]></description>
      <content:encoded><![CDATA[<p>The Sassandra is the second-longest river in Ivory Coast, flowing roughly 650 kilometers from the Guinea Highlands to the Atlantic coast. Before the dam, the cascade near Soubre was part of a natural rhythm that fish and riverside communities had adapted to over millennia. The ri...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/soubre-hydroelectric-power-station/">Soubre Hydroelectric Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-the-rivers-other-life.mp3</guid>
      <enclosure url="https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-the-rivers-other-life.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Soubre Hydroelectric Power Station: Power for a Growing Nation</title>
      <link>https://qualla.com/soubre-hydroelectric-power-station/</link>
      <description><![CDATA[When Ivory Coast's president inaugurated the Soubre station on November 2, 2017, the ceremony was more than a ribbon-cutting. It marked the completion of a four-year construction effort and the beginning of a new phase in the country's energy strategy. Ivory Coast is the largest ...]]></description>
      <content:encoded><![CDATA[<p>When Ivory Coast's president inaugurated the Soubre station on November 2, 2017, the ceremony was more than a ribbon-cutting. It marked the completion of a four-year construction effort and the beginning of a new phase in the country's energy strategy. Ivory Coast is the largest ...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/soubre-hydroelectric-power-station/">Soubre Hydroelectric Power Station on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-power-for-a-growing-nation.mp3</guid>
      <enclosure url="https://qualla.com/_m/e/c/5/2/soubre-hydroelectric-power-station-wp/ec52-soubre-hydroelectric-power-station-power-for-a-growing-nation.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
