<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: Rio Madeira HVDC System</title>
    <link>https://qualla.com/rio-madeira-hvdc-system</link>
    <description><![CDATA[Once the world's longest HVDC power line, this 2,375-kilometer line from the Amazon rainforest to southeastern Brazil delivers 7,100 megawatts of hydroelectric power.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:08 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[Once the world's longest HVDC power line, this 2,375-kilometer line from the Amazon rainforest to southeastern Brazil delivers 7,100 megawatts of hydroelectric power.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: Rio Madeira HVDC System</title>
      <link>https://qualla.com/rio-madeira-hvdc-system</link>
    </image>
    <item>
      <title>Rio Madeira HVDC System: Introduction</title>
      <link>https://qualla.com/rio-madeira-hvdc-system/</link>
      <description><![CDATA[Two thousand three hundred and seventy-five kilometers. That is the distance electricity must travel from the hydroelectric dams on the Madeira River, deep in the Amazon Basin, to the air-conditioned offices and illuminated storefronts of Sao Paulo state. When Bipole 1 began commercial operation in 2014, the Rio Madeira HVDC system became the longest high-voltage direct current transmission line on Earth, surpassing China's Xiangjiaba-Shanghai system. (China's Changji-Guquan line, completed in 2019 at 3,293 kilometers, has since taken that record.) It is an invisible thread connecting two Brazils -- the remote rainforest interior where the power is generated, and the densely populated southeast where the power is consumed.]]></description>
      <content:encoded><![CDATA[<p>Two thousand three hundred and seventy-five kilometers. That is the distance electricity must travel from the hydroelectric dams on the Madeira River, deep in the Amazon Basin, to the air-conditioned offices and illuminated storefronts of Sao Paulo state. When Bipole 1 began commercial operation in 2014, the Rio Madeira HVDC system became the longest high-voltage direct current transmission line on Earth, surpassing China's Xiangjiaba-Shanghai system. (China's Changji-Guquan line, completed in 2019 at 3,293 kilometers, has since taken that record.) It is an invisible thread connecting two Brazils -- the remote rainforest interior where the power is generated, and the densely populated southeast where the power is consumed.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/rio-madeira-hvdc-system/">Rio Madeira HVDC System on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Rio Madeira HVDC System: Harnessing the Madeira</title>
      <link>https://qualla.com/rio-madeira-hvdc-system/</link>
      <description><![CDATA[The power begins at two run-of-the-river generating stations on the Madeira River near Porto Velho, the capital of Rondonia state. Santo Antonio, just six kilometers from the city, contributes 3,150 megawatts. A hundred kilometers upstream, the Jirau plant adds another 3,750 mega...]]></description>
      <content:encoded><![CDATA[<p>The power begins at two run-of-the-river generating stations on the Madeira River near Porto Velho, the capital of Rondonia state. Santo Antonio, just six kilometers from the city, contributes 3,150 megawatts. A hundred kilometers upstream, the Jirau plant adds another 3,750 mega...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/rio-madeira-hvdc-system/">Rio Madeira HVDC System on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-harnessing-the-madeira.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-harnessing-the-madeira.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Rio Madeira HVDC System: Choosing the Invisible Highway</title>
      <link>https://qualla.com/rio-madeira-hvdc-system/</link>
      <description><![CDATA[With 2,375 kilometers separating the dams from the load centers, direct current was the obvious choice -- but obvious does not mean unchallenged. Engineers evaluated sixteen different options, including all-AC configurations, hybrid AC-DC solutions, and DC lines at three differen...]]></description>
      <content:encoded><![CDATA[<p>With 2,375 kilometers separating the dams from the load centers, direct current was the obvious choice -- but obvious does not mean unchallenged. Engineers evaluated sixteen different options, including all-AC configurations, hybrid AC-DC solutions, and DC lines at three differen...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/rio-madeira-hvdc-system/">Rio Madeira HVDC System on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-choosing-the-invisible-highway.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-choosing-the-invisible-highway.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Rio Madeira HVDC System: Cathedrals of Conversion</title>
      <link>https://qualla.com/rio-madeira-hvdc-system/</link>
      <description><![CDATA[At each end of the line, converter stations perform the transformation between AC and DC power. The Porto Velho station, at the northern end, is where the alternating current from the dams becomes the direct current that can survive a 2,375-kilometer journey with acceptable losse...]]></description>
      <content:encoded><![CDATA[<p>At each end of the line, converter stations perform the transformation between AC and DC power. The Porto Velho station, at the northern end, is where the alternating current from the dams becomes the direct current that can survive a 2,375-kilometer journey with acceptable losse...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/rio-madeira-hvdc-system/">Rio Madeira HVDC System on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-cathedrals-of-conversion.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-cathedrals-of-conversion.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>Rio Madeira HVDC System: The Thread That Binds Two Brazils</title>
      <link>https://qualla.com/rio-madeira-hvdc-system/</link>
      <description><![CDATA[The Rio Madeira HVDC system is more than an engineering superlative. It represents a fundamental tension in Brazilian development: the energy resources are in the Amazon, but the people and industry are in the southeast. Moving that energy requires infrastructure that stretches a...]]></description>
      <content:encoded><![CDATA[<p>The Rio Madeira HVDC system is more than an engineering superlative. It represents a fundamental tension in Brazilian development: the energy resources are in the Amazon, but the people and industry are in the southeast. Moving that energy requires infrastructure that stretches a...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/rio-madeira-hvdc-system/">Rio Madeira HVDC System on Qualla</a></p>]]></content:encoded>
      <pubDate>Fri, 06 Mar 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-the-thread-that-binds-two-brazils.mp3</guid>
      <enclosure url="https://qualla.com/_m/6/w/6/t/rio-madeira-hvdc-system-wp/6w6t-rio-madeira-hvdc-system-the-thread-that-binds-two-brazils.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
