<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: HVDC DolWin1</title>
    <link>https://qualla.com/hvdc-dolwin1</link>
    <description><![CDATA[A 12,000-tonne converter platform standing alone in the North Sea, hauling 800 megawatts of offshore wind across 165 kilometres of cable to the German grid.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:34 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[A 12,000-tonne converter platform standing alone in the North Sea, hauling 800 megawatts of offshore wind across 165 kilometres of cable to the German grid.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: HVDC DolWin1</title>
      <link>https://qualla.com/hvdc-dolwin1</link>
    </image>
    <item>
      <title>HVDC DolWin1: Introduction</title>
      <link>https://qualla.com/hvdc-dolwin1/</link>
      <description><![CDATA[From a thousand feet up, DolWin Alpha looks like a hotel that lost its way — a yellow industrial slab, 64 by 42 metres, perched on legs in the open North Sea about 100 kilometres from shore. There are no rooms inside, no balconies. The structure is essentially a 12,000-tonne electrical substation that someone decided to build in the ocean. Its single job is to take alternating current from a cluster of wind turbines, convert it to direct current, and send it down 165 kilometres of cable to the German mainland. DolWin1 is the link that makes the entire German offshore wind project economic.]]></description>
      <content:encoded><![CDATA[<p>From a thousand feet up, DolWin Alpha looks like a hotel that lost its way — a yellow industrial slab, 64 by 42 metres, perched on legs in the open North Sea about 100 kilometres from shore. There are no rooms inside, no balconies. The structure is essentially a 12,000-tonne electrical substation that someone decided to build in the ocean. Its single job is to take alternating current from a cluster of wind turbines, convert it to direct current, and send it down 165 kilometres of cable to the German mainland. DolWin1 is the link that makes the entire German offshore wind project economic.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/hvdc-dolwin1/">HVDC DolWin1 on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>HVDC DolWin1: Why DC, Out Here</title>
      <link>https://qualla.com/hvdc-dolwin1/</link>
      <description><![CDATA[Alternating current loses too much power over long subsea distances; cables behave like big capacitors and bleed energy as they reach toward the coast. Above about 70 kilometres of seabed, conventional AC stops penny-pencilling and high-voltage DC starts making sense. DolWin1 run...]]></description>
      <content:encoded><![CDATA[<p>Alternating current loses too much power over long subsea distances; cables behave like big capacitors and bleed energy as they reach toward the coast. Above about 70 kilometres of seabed, conventional AC stops penny-pencilling and high-voltage DC starts making sense. DolWin1 run...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/hvdc-dolwin1/">HVDC DolWin1 on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-why-dc-out-here.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-why-dc-out-here.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>HVDC DolWin1: The Yellow Box on Stilts</title>
      <link>https://qualla.com/hvdc-dolwin1/</link>
      <description><![CDATA[DolWin Alpha was built ashore, not at sea. Heerema assembled the topside in Zwijndrecht, Netherlands, where it slowly grew into something the size of a city block before being floated out to the German Bight in 2013 and lowered onto a fixed jacket foundation. Inside, ABB's Cascad...]]></description>
      <content:encoded><![CDATA[<p>DolWin Alpha was built ashore, not at sea. Heerema assembled the topside in Zwijndrecht, Netherlands, where it slowly grew into something the size of a city block before being floated out to the German Bight in 2013 and lowered onto a fixed jacket foundation. Inside, ABB's Cascad...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/hvdc-dolwin1/">HVDC DolWin1 on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-the-yellow-box-on-stilts.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-the-yellow-box-on-stilts.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>HVDC DolWin1: Energiewende, Wired</title>
      <link>https://qualla.com/hvdc-dolwin1/</link>
      <description><![CDATA[DolWin1 is one stitch in a much bigger seam. Germany's Energiewende — the political project of replacing nuclear and coal with renewables — committed the country to building gigawatts of offshore wind capacity in the German Bight, far from the load centres that need the power. Th...]]></description>
      <content:encoded><![CDATA[<p>DolWin1 is one stitch in a much bigger seam. Germany's Energiewende — the political project of replacing nuclear and coal with renewables — committed the country to building gigawatts of offshore wind capacity in the German Bight, far from the load centres that need the power. Th...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/hvdc-dolwin1/">HVDC DolWin1 on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-energiewende-wired.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-energiewende-wired.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>HVDC DolWin1: Quietly Online</title>
      <link>https://qualla.com/hvdc-dolwin1/</link>
      <description><![CDATA[There was no dramatic switching ceremony. The platform was installed in August 2013, trial operation with Borkum West began in December 2014, and TenneT — the Dutch-owned grid operator that runs much of northern Germany's transmission — formally took ownership in July 2015. It wa...]]></description>
      <content:encoded><![CDATA[<p>There was no dramatic switching ceremony. The platform was installed in August 2013, trial operation with Borkum West began in December 2014, and TenneT — the Dutch-owned grid operator that runs much of northern Germany's transmission — formally took ownership in July 2015. It wa...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/hvdc-dolwin1/">HVDC DolWin1 on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-quietly-online.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/s/e/hvdc-dolwin1-wp/u1se-hvdc-dolwin1-quietly-online.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
