<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: 2008 Channel Tunnel fire</title>
    <link>https://qualla.com/2008-channel-tunnel-fire</link>
    <description><![CDATA[On 11 September 2008, a lorry on a freight shuttle caught fire 11 kilometres into the Channel Tunnel, and someone smashed a window with a hammer to get out.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:32 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[On 11 September 2008, a lorry on a freight shuttle caught fire 11 kilometres into the Channel Tunnel, and someone smashed a window with a hammer to get out.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: 2008 Channel Tunnel fire</title>
      <link>https://qualla.com/2008-channel-tunnel-fire</link>
    </image>
    <item>
      <title>2008 Channel Tunnel fire: Introduction</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[Eleven kilometres into the Channel Tunnel, somewhere under the seabed, a lorry on the back of a freight shuttle began to burn. The carriage filled with thick smoke. The train ground to a halt. The lights went out. The official evacuation procedure said wait, stay put, let the ventilation clear the smoke before opening anything. One passenger, sealed in the dark with a stuck emergency exit, picked up a hammer and broke the window himself.]]></description>
      <content:encoded><![CDATA[<p>Eleven kilometres into the Channel Tunnel, somewhere under the seabed, a lorry on the back of a freight shuttle began to burn. The carriage filled with thick smoke. The train ground to a halt. The lights went out. The official evacuation procedure said wait, stay put, let the ventilation clear the smoke before opening anything. One passenger, sealed in the dark with a stuck emergency exit, picked up a hammer and broke the window himself.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>2008 Channel Tunnel fire: An Underwater Afternoon Goes Wrong</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[It was 14:57 BST on 11 September 2008. A France-bound Eurotunnel Shuttle was halfway through its 50-kilometre run under the English Channel, carrying 27 heavy goods vehicles and 32 people, mostly lorry drivers riding with their trucks. One of the vehicles caught fire in the North...]]></description>
      <content:encoded><![CDATA[<p>It was 14:57 BST on 11 September 2008. A France-bound Eurotunnel Shuttle was halfway through its 50-kilometre run under the English Channel, carrying 27 heavy goods vehicles and 32 people, mostly lorry drivers riding with their trucks. One of the vehicles caught fire in the North...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-an-underwater-afternoon-goes-wrong.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-an-underwater-afternoon-goes-wrong.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>2008 Channel Tunnel fire: Down the Service Tunnel</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[The Channel Tunnel has a clever layout. Two main running tunnels carry trains in opposite directions, separated by a narrower central service tunnel that is kept at slight positive pressure so smoke cannot drift into it from the running bores. Cross-passages link the three. When ...]]></description>
      <content:encoded><![CDATA[<p>The Channel Tunnel has a clever layout. Two main running tunnels carry trains in opposite directions, separated by a narrower central service tunnel that is kept at slight positive pressure so smoke cannot drift into it from the running bores. Cross-passages link the three. When ...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-down-the-service-tunnel.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-down-the-service-tunnel.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>2008 Channel Tunnel fire: Sixteen Hours at a Thousand Degrees</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[Above ground, more than 300 firefighters from both sides of the Channel converged on the portals. Crews came from East Sussex, West Sussex, London, and Essex on the British side, and from across northern France. They could not get to the fire in time. Eurotunnel's procedure requi...]]></description>
      <content:encoded><![CDATA[<p>Above ground, more than 300 firefighters from both sides of the Channel converged on the portals. Crews came from East Sussex, West Sussex, London, and Essex on the British side, and from across northern France. They could not get to the fire in time. Eurotunnel's procedure requi...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-sixteen-hours-at-a-thousand-degrees.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-sixteen-hours-at-a-thousand-degrees.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>2008 Channel Tunnel fire: Rebuilding a Tube Under the Sea</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[The undamaged south tunnel reopened first. A test freight train slipped through it at 00:08 BST on 13 September. Eurostar resumed limited passenger service at 06:00 the same morning, with 18 trains in each direction including the family-favourite London-to-Disneyland-Paris run. S...]]></description>
      <content:encoded><![CDATA[<p>The undamaged south tunnel reopened first. A test freight train slipped through it at 00:08 BST on 13 September. Eurostar resumed limited passenger service at 06:00 the same morning, with 18 trains in each direction including the family-favourite London-to-Disneyland-Paris run. S...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-rebuilding-a-tube-under-the-sea.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-rebuilding-a-tube-under-the-sea.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>2008 Channel Tunnel fire: What the Hammer Taught</title>
      <link>https://qualla.com/2008-channel-tunnel-fire/</link>
      <description><![CDATA[The investigation, led jointly by France's Land Transport Accident Investigation Bureau and Britain's Rail Accident Investigation Branch, published its report on 22 November 2010. The findings were sober. Evacuation instructions, previously in only English and French, would now b...]]></description>
      <content:encoded><![CDATA[<p>The investigation, led jointly by France's Land Transport Accident Investigation Bureau and Britain's Rail Accident Investigation Branch, published its report on 22 November 2010. The findings were sober. Evacuation instructions, previously in only English and French, would now b...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/2008-channel-tunnel-fire/">2008 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-what-the-hammer-taught.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/1/2008-channel-tunnel-fire-wp/u111-2008-channel-tunnel-fire-what-the-hammer-taught.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>6</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
