<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
     xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd"
     xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:podcast="https://podcastindex.org/namespace/1.0"
     xmlns:psc="http://podlove.org/simple-chapters">
  <channel>
    <title>Qualla: 1996 Channel Tunnel fire</title>
    <link>https://qualla.com/1996-channel-tunnel-fire</link>
    <description><![CDATA[On 18 November 1996, fire broke out on a freight shuttle deep beneath the English Channel - testing the world's longest undersea tunnel barely two years after it opened.]]></description>
    <language>en-us</language>
    <copyright>© 2026 Bendyline</copyright>
    <lastBuildDate>Mon, 20 Jul 2026 10:21:32 GMT</lastBuildDate>
    <itunes:author>Qualla</itunes:author>
    <itunes:summary><![CDATA[On 18 November 1996, fire broke out on a freight shuttle deep beneath the English Channel - testing the world's longest undersea tunnel barely two years after it opened.]]></itunes:summary>
    <itunes:type>serial</itunes:type>
    <itunes:explicit>false</itunes:explicit>
    <itunes:image href="https://qualla.com/_res/siteimages/rsslogo.png"/>
    <itunes:owner>
      <itunes:name>Qualla</itunes:name>
      <itunes:email>support@bendyline.com</itunes:email>
    </itunes:owner>
    <itunes:category text="Society &amp; Culture">
        <itunes:category text="Places &amp; Travel"/>
    </itunes:category>
    <podcast:locked>yes</podcast:locked>
    <image>
      <url>https://qualla.com/_res/siteimages/rsslogo.png</url>
      <title>Qualla: 1996 Channel Tunnel fire</title>
      <link>https://qualla.com/1996-channel-tunnel-fire</link>
    </image>
    <item>
      <title>1996 Channel Tunnel fire: Introduction</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[At 21:48 on 18 November 1996, the lorry drivers riding in the amenity coach of HGV Shuttle No. 7539 noticed a glow on the train behind them as it entered the French portal of the Channel Tunnel. By the time the alarm crackled through the locomotive cab, a fire roughly two meters square was burning on one of the open lattice wagons - and the train was already accelerating into the chalk marl beneath the English Channel. Standard procedure called for the driver to keep going and let the fire be dealt with on arrival in the UK. Ten minutes later, with smoke rolling through the rake and the train faulting against derailment, the driver stopped at kilometer 19, almost a hundred meters below the seabed.]]></description>
      <content:encoded><![CDATA[<p>At 21:48 on 18 November 1996, the lorry drivers riding in the amenity coach of HGV Shuttle No. 7539 noticed a glow on the train behind them as it entered the French portal of the Channel Tunnel. By the time the alarm crackled through the locomotive cab, a fire roughly two meters square was burning on one of the open lattice wagons - and the train was already accelerating into the chalk marl beneath the English Channel. Standard procedure called for the driver to keep going and let the fire be dealt with on arrival in the UK. Ten minutes later, with smoke rolling through the rake and the train faulting against derailment, the driver stopped at kilometer 19, almost a hundred meters below the seabed.</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-intro.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-intro.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>1</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>1996 Channel Tunnel fire: The Longest Ten Minutes</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[The Channel Tunnel was barely two and a half years old. Inaugurated by the Queen and President Mitterrand in May 1994, the 50.45-kilometer link between Folkestone and Coquelles had become the longest undersea railway tunnel in the world, a feat of engineering whose safety case re...]]></description>
      <content:encoded><![CDATA[<p>The Channel Tunnel was barely two and a half years old. Inaugurated by the Queen and President Mitterrand in May 1994, the 50.45-kilometer link between Folkestone and Coquelles had become the longest undersea railway tunnel in the world, a feat of engineering whose safety case re...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-the-longest-ten-minutes.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-the-longest-ten-minutes.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>2</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>1996 Channel Tunnel fire: Blades Set Wrong</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[The supplementary ventilation system - the tunnel's last line of defense against exactly this scenario - was switched on, then ran for seven minutes with the fan blades set in the wrong direction, pushing smoke toward the people it was meant to protect. Once the error was caught,...]]></description>
      <content:encoded><![CDATA[<p>The supplementary ventilation system - the tunnel's last line of defense against exactly this scenario - was switched on, then ran for seven minutes with the fan blades set in the wrong direction, pushing smoke toward the people it was meant to protect. Once the error was caught,...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-blades-set-wrong.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-blades-set-wrong.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>3</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>1996 Channel Tunnel fire: Chalk That Held</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[Eight French firefighters had left their station at 21:56; eight British firefighters followed at 22:03. They worked five hours in shifts so short that crews retreated to the service tunnel between bursts, because the heat radiating off the burning wagons was almost unbearable. T...]]></description>
      <content:encoded><![CDATA[<p>Eight French firefighters had left their station at 21:56; eight British firefighters followed at 22:03. They worked five hours in shifts so short that crews retreated to the service tunnel between bursts, because the heat radiating off the burning wagons was almost unbearable. T...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-chalk-that-held.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-chalk-that-held.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>4</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>1996 Channel Tunnel fire: The Policy That Changed</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[Three investigations followed: a French judicial inquiry, an internal Eurotunnel review, and a binational report by the Channel Tunnel Safety Authority. The findings were uncomfortable. The fire had been treated as an "unconfirmed alarm" for five critical minutes. French crossove...]]></description>
      <content:encoded><![CDATA[<p>Three investigations followed: a French judicial inquiry, an internal Eurotunnel review, and a binational report by the Channel Tunnel Safety Authority. The findings were uncomfortable. The fire had been treated as an "unconfirmed alarm" for five critical minutes. French crossove...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-the-policy-that-changed.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-the-policy-that-changed.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>5</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
    <item>
      <title>1996 Channel Tunnel fire: Reopening in Phases</title>
      <link>https://qualla.com/1996-channel-tunnel-fire/</link>
      <description><![CDATA[The damage stretched far beyond the burnt train. Five hundred meters of track, eight hundred meters of overhead line and refrigeration pipe, fifteen hundred meters of signalling, four cross-passage doors, five pressure-relief duct doors, and a kilometer's worth of cables and ligh...]]></description>
      <content:encoded><![CDATA[<p>The damage stretched far beyond the burnt train. Five hundred meters of track, eight hundred meters of overhead line and refrigeration pipe, fifteen hundred meters of signalling, four cross-passage doors, five pressure-relief duct doors, and a kilometer's worth of cables and ligh...</p>
<p><strong>Read more:</strong> <a href="https://qualla.com/1996-channel-tunnel-fire/">1996 Channel Tunnel fire on Qualla</a></p>]]></content:encoded>
      <pubDate>Sun, 17 May 2026 00:00:00 GMT</pubDate>
      <guid isPermaLink="true">https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-reopening-in-phases.mp3</guid>
      <enclosure url="https://qualla.com/_m/u/1/1/4/1996-channel-tunnel-fire-wp/u114-1996-channel-tunnel-fire-reopening-in-phases.mp3" type="audio/mpeg" length="100000"/>
      <itunes:duration>0:06</itunes:duration>
      <itunes:episode>6</itunes:episode>
      <itunes:episodeType>full</itunes:episodeType>
    </item>
  </channel>
</rss>
